Results 1 - 10 of 1104 (Sorted by date)
Policy Report
Author:
International Renewable Energy Agency (IRENA)
国際再生可能エネルギー機関(IRENA)による報告書「Transforming the Energy System: And Holding the Line on Rising Global Temperatures」のIGES翻訳版(暫定非公式訳)。現行計画・政策に基づくエネルギーシナリオと低炭素技術の野心的な取り組みに基づくエネルギー変革シナリオを比較分析し、気候変動に対して強靭で持続可能な未来を築くためには、世界でエネルギー変革を加速させる必要があると指摘しています。具体的には、再生可能エネルギー、エネルギー効率対策、熱・輸送の電化への投資を拡大し、こうしたエネルギー投資を広範な社会経済政策と連携させることで、公正なエネルギー変革を包括的に進めるべきであるとしています...
Data or Tool
IGES's GHG emissions database aims to compile the latest information on GHG and CO2 emissions, as reported annually by UNFCCC Annex I countries. The data covers the period from from 1990 up to two years before the submission date of the reports. This database also provides information on target compliance, in order to compare historical emission...
Keywords:
Policy Report
Author:
United Nations Environment Programme [UNEP]
国連環境計画(UNEP)が発表した「Emissions Gap(排出ギャップ)Report 2019」エグゼクティブ・サマリーの日本語翻訳版(暫定非公式訳)。2018年に排出された温室効果ガス(GHG)の総量、今後予想される排出量及びパリ協定目標を達成するための排出量との差である「排出ギャップ」などについて様々な分析を行っている。特に、世界のGHG排出量の8割近くを占めるG20メンバーによる早急な取り組み強化の必要性、再生可能エネルギーの利用拡大、エネルギー効率化を検証し、世界の総排出削減を進め、排出ギャップを埋める野心的な方策を提案し、経済・社会全体の革新的な変化の必要性を強調している。
Briefing Note
.sup{font-size: 75.5%;vertical-align: top;position: relative;top: -0.1em;} .sub{vertical-align: sub;font-size: 75.5%;} .briefing-note h2{color:#70ad47;} ポイント 1.5℃目標を念頭にした2050年ネットゼロ排出が野心度を測る一つのベンチマークとなった。 59カ国が2020年末までにNDC引き上げを行うと表明し、11カ国が既に国内プロセスを開始しているとされる。また、66カ国・地域、10の州、102の都市、87の企業、そして12投資機関が2050年までにネットゼロ排出を達成、あるいはそれに向けた動きを加速すると表明1。 島嶼国...
Submission to Policy Process
This submission proposes elements related to common tabular formats (CTFs) for the electronic reporting of the information necessary to track progress made in implementing and achieving nationally determined contributions under Article 4 of the Paris Agreement. Summary of the submission: An additional instruction can be helpful for countries to...
Data or Tool
IGES Biennial Update Report (BUR) Database provides key information reported in biennial update reports (BURs) submitted by Non-Annex I Countries to the UNFCCC. According to UNFCCC COP decision 2/CP.17, non-Annex I Parties, consistent with their capabilities and the level of support provided for reporting, should submit their first BUR by December...
Peer-reviewed Article
In Journal of Cleaner Production
Author:
Capacity building support by means of international development projects for developing countries to prepare national reporting under the Paris Agreement has taken on increasing importance. Given that support for capacity building has been provided for more than two decades, the aim of our research is to assess past trends in capacity building...
Data or Tool
IGES's CDM Programme of Activities (PoA) Database aims at providing comprehensive and organised information on PoAs in an easy-to-understand way. It also compiles information on Component Project Activities (CPAs). The database allows users to search for specific data on each project in the pipeline more easily and enables them to use relevant...
Discussion Paper
This paper provides some background information on coal industry transition that has occurred recently in China, and shows prospects for better transition management with a focus on employment. Using statistical data and scenario analysis results provided in existing literature, changes in coal consumption, production and international trade in...
Data or Tool
IGES CDM Monitoring and Issuance Database aims at providing comprehensive, organised information on the CDM projects registered by UNFCCC EB. The listed information helps users to organise the results of the CER issuance procedures for project activities after monitoring. All the information is extracted from publicly available sources on the...